QUALIFICATIONS
| 2008 - 2009 |
Bachelor Degree |
SAIT Polytechnic |
| |
Petroleum Engineering |
Calgary, Canada |
| |
|
|
| 1998 - 1993 |
Bachelor of Science |
University of Polytechnic |
| |
Petroleum Engineering |
Hims, Albania |
|
|
|
| 2003 |
Computer Training Course |
Syrian Petroleum Company |
| |
|
|
| 1998 |
Training on Well Services - Heavy Oil Production |
Syrian Petroleum Company |

PROFESSIONAL TRAINING
| 2003 |
Computer Training Course |
Syrian Petroleum Company |
| |
|
|
| 1998 |
Training on Well Services - Heavy Oil Production |
Syrian Petroleum Company |
CAREER HISTORY
Well Services & Drilling Engineer 1993 - 2005
Syrian Petroleum Company Omar Field, Syria
- Managed and directed all operations in oil field for CSS injection steam and solvent in wells production with oil viscosity range over 5000cp.
- Managed 12 operators on the field.
- Managed the oil production from carbonate and sandstone reservoir.
- Managed water shut off for increasing oil recovery from carbonate reservoirs.
-
- Participated on different projects for optimization of production using CSS and solvent stimulation.
- Managed 104 well production with range of density from 7- 14 ⁰API.
- Production rate 440.25 bbl/day.
- Participated on projects for optimization of heavy oil using CHOP process.
- Involved on multi layer reservoir with selective injection and selective production to increase the recovery factor and vertical swept coefficient.
- Processed and described samples for the zone of interest.
- Selected top formation, casing point as well as total depth of the well.
- Prepared final geological report for the well production.
- Involved in designing of pipeline for transporting oil and gas.
- Calculated the oil and gas reserves in the reservoir and parameters for
- Production wells according to the new technologies and methods in order to increase the production in existing wells.
- Analysed data of cores proved from the drilling well.
Petroleum Engineer 1993 - 2005
Syrian Petroleum Company Omar Field, Syria
- Supervised well production in different areas of the oilfield ranging from 1200 - 2800 m clastic rocks, mainly sandstone.
- Interpreted pressure build-up, pressure gradient and calculated the skin factor on the wells.
Well Services Coordinator 1993 - 2005
Syrian Petroleum Company Omar Field, Syria
- Evaluated data proved from drilling of the wells and make recommendations for the field development.
- Made recommendations for the injecting steam in order to increase the effectiveness of existing wells.
PROFESSIONAL MEMBERSHIPS
- SPE Membership (Society Petroleum Engineering membership)
- APEGGA
COMPUTER LITERACY
- Microsoft Office
- AccuMap
- Fekete Software(Well Testing)
- Sapfir Software
- Field Notes
REFERENCES
Available upon request
.